- Client:
Town of Avon
- Location:
Avon, Colorado
- Phase I Scope:
40,000 GSF
- Phase II Scope:
35,000 GSF
- Total Project Cost:
$12,000,000
- Phase I Completion:
1995
- Phase II Completion:
TBD
Christopher Carvell
Principal-in-Charge of Design
Phase I completed while at CWFJHB
|
 |
 |
|
Project Features:
- 40,000 gallon splash/river pool and a water surface area of 2,000 sf.
- 112,000 gallon, 75 foot, five lane lap pool with a water surface area of 2,900 sf.
- 24,000 gallon leisure/play pool with a water surface area of 1,900 sf.
- 140 foot figure eight slide.
- Diving tank with a 2/3 meter diving board.
- Water bridge that connects the leisure pool and the splash pool.
- 3,600 gallon therapeutic pool.
- Family change room separate from the locker room areas.
- An overhead and underground forced air system that provide 7.5 air changes per hour in the pool area.
- Natural fir wood plank ceiling in the aquatics area provides warmth and acoustical attenuation for the patrons.
- State-of-the-Art equipment in the cardiovascular/weight room.
- Cardiovascular/weight room theater audio/visual system.
- A lobby area with a fireplace and furnishings.
- 1,700 sf child care complex with a sunken story telling area.
- Fenced exterior spaces at both the child care and the aquatics area.
|
|
|
|