-
Home
Exterior - Elevation
  • Client:
    Town of Avon
  • Location:
    Avon, Colorado
  • Phase I Scope:
    40,000 GSF
  • Phase II Scope:
    35,000 GSF
  • Total Project Cost:
    $12,000,000
  • Phase I Completion:
    1995
  • Phase II Completion:
    TBD

Christopher Carvell
Principal-in-Charge of Design
Phase I completed while at CWFJHB

      Details
Interior - Pool Rendering - Floor Plan
Project Features:
  • 40,000 gallon splash/river pool and a water surface area of 2,000 sf.
  • 112,000 gallon, 75 foot, five lane lap pool with a water surface area of 2,900 sf.
  • 24,000 gallon leisure/play pool with a water surface area of 1,900 sf.
  • 140 foot figure eight slide.
  • Diving tank with a 2/3 meter diving board.
  • Water bridge that connects the leisure pool and the splash pool.
  • 3,600 gallon therapeutic pool.
  • Family change room separate from the locker room areas.
  • An overhead and underground forced air system that provide 7.5 air changes per hour in the pool area.
  • Natural fir wood plank ceiling in the aquatics area provides warmth and acoustical attenuation for the patrons.
  • State-of-the-Art equipment in the cardiovascular/weight room.
  • Cardiovascular/weight room theater audio/visual system.
  • A lobby area with a fireplace and furnishings.
  • 1,700 sf child care complex with a sunken story telling area.
  • Fenced exterior spaces at both the child care and the aquatics area.
Back to Top